The Kenya Roads Board (KRB) has disbursed Sh539 million for maintenance of roads in coast counties.
The fund is part of the Sh4.4 billion conditional grant for the maintenance of roads in all the 47 counties in this 2019/2020 financial year.
In the allocation for coast counties, Kilifi got a big share of Sh148.2 million followed by Kwale which has received Sh110.1 million, Mombasa 100.1 million, Tana River Sh83.1 million, Taita Taveta Sh60.2 million and Sh36.8 million given to Lamu county.
“Funds have been released to county governments that have complied with conditions of the grant,” KRB executive director Jacob Ruwa said through an advert in local dailies.
The monies, according to KRB, is being disbursed in two quarters of the financial year.
In the first quarter, Kilifi received Sh74.1 million, Kwale Sh55.2 million, Lamu Sh18.4 million while Mombasa will get Sh50 million, Taita Taveta will receive Sh30 million and Tana River 41.5 million.
The fund for the first quarter is part of the Sh2.2 billion (out of the Sh4.4 billion in total) disbursed to all the counties across the entire country during the quarter. Another Sh2.2 billion will be disbursed to the counties in the second quarter of the financial year where the coast counties will receive the exact amount, they received in the first quarter.
The funds are being released each financial year as per the County Allocation of Revenue Act (CARA), 2019.
The conditional grants have become the main source of development funds in counties as disbursements from equitable share mainly go into recurrent expenditure.
This include the grants for the maintenance of the roads in all the counties across the country. The source of the grants includes the World Bank’s Kenya Urban Support Programme, Danida’s health programmes, NARIGP for agricultural support and the European Union that supports construction of major water projects.
The donors issue grants for different projects including those from World Bank which mainly goes in construction of roads and their maintenance. In the recent past, Coast region has been a major beneficiary of big road projects including the Dongo Kundu project, Kwa Jomvu project among others.
more recommended stories
THE GOVERNOR DISCOVERS FISCAL DISCIPLINE — FOUR YEARS TOO LATE?Perhaps one of the most.
SHAKAHOLA: 200 YEARS FOR MACKENZIE, BUT WHO WILL ANSWER FOR THE STATE’S FAILURE?Kwaela News Network | Editorial.
WHO IS THIS GOVERNOR TAITA-TAVETA COUNTY IS LOOKING FOR BEYOND 2027?As the 2027 General Election.
COURT HALTS COAST WATER DISCONNECTIONS AS EJF CHALLENGES SH6 BILLION DEBT CLAIMKwale, 29 August 2026 —.
THE LEGENDARY 70-YEAR-OLD MZIMA PIPELINE LIVES TO BURST ANOTHER DAYGovernment Celebrates Repairing What It Failed.
TRAGIC LOSS OF JOHN KALAGHE JOSHUA LEAVES FAMILY AND COMMUNITY IN MOURNINGIt is with profound sorrow and.
THE NAIROBI–MOMBASA EXPRESSWAY: A DECADE OF PROMISES, YET NO HIGHWAY IN SIGHTThe Highway That Exists Only.
FROM FUEL TO DRINKING WATER: HOW A BILLION-SHILLING PIPELINE DREAM RAN AGROUNDA Lesson in Why Politics Should.
LIKONI BRIDGE: WHAT HAPPENED TO RUTO’S KSH 100 BILLION PROMISE?For years, residents of Mombasa and.
MZIMA PHASE TWO: SIX DECADES OF PROMISES, DELAYS AND GOVERNMENT FAILURECoast Residents Continue to Suffer as.
ABSENT LEADERSHIP OR CALCULATED DISRESPECT? QUESTIONS MOUNT OVER KINGI’S NO-SHOW AT MGANGE NYIKA FUNDRAISER.Serious questions are emerging following the.
ATHANAS MBELE’S “BIG 7 AGENDA” VISION POSITIONS WUNDANYI FOR TRANSFORMATIONAL GROWTHWundanyi is emerging at the center.
POLITICS ON OVERDRIVEKenya is not a permanent.
WHY TAITA TAVETA NEEDS ITS OWN POLITICAL VEHICLEBy Geoffrey Kimonge (GK) The Case.
HAS GREED CONSUMED THE TAITA TAVETA COUNTY ASSEMBLY?By Geoffrey Kimonge (GK) Has the.
THE COLLAPSE OF PAA: AMASON KINGI’S POLITICAL HOLLOWING EXPOSED IN MAGARINI AND TAITA TAVETABy any political measure, Pamoja.

Leave a Comment